The right flange of CVD furnace
· Water cooling to prevent sealing o-ring from melting (water cooler is not included, please click water chiller to order)
· KF25 vacuum fitting (to a vacuum pump, please click to order a pump, vacuum hose, valve and sealing gasket)
· Slidable for the customer to easily and fast push/pull in/out sample
· One quartz wafer holder ( 3" Dia. ) is included and the flange with heating radiation block
· An anti-corrosive capacitance diaphragm gauge is included
Left flange (between CVD Furnace and Heater) with four 1/8'' fittings for 1/8'' tube:
· Two 1/8'' fitting on the flange for independently and directly delivering any gas into the CVD furnace
· One 1/8'' fitting for delivering heated gas from heater to CVD furnace
· One 1/4'' fitting for bypassing the gas (without heating) to the CVD furnace (inside the CVD furnace, the gas tube is merged with the heated gas pipe by a T fitting)
Note: How gas pipe assembled in the CVD furnace through above 1/8'' fitting:
· One 1/4'' quartz tube delivers the vapor gas from heater(also the bypass gas by a T fitting)
· Two 1/4'' quartz tube delivery extra gas via the two separate 1/8'' fitting on the big furnace left the flange
· These three 1/4'' quartz tubes inside CVD furnace is in parallel and vertically 1'' higher than sample holder
· These three 1/4'' quartz tubes can be easily removed to clean or replaced once get stuck or corroded
Heater:
· Left flange: one 1/8'' gas fitting to deliver gas to the heater for pre-heating and then to CVD furnace
· On the right side to CVD furnace with necessary thermal block material to minimize the temperature gradient at the interface between the heater and CVD furnace
· Furnace Chamber Installation
· 2- 1/4" pipe adapter is installed on each flange |