The tube type can be placed on the workbench to suit the operating height of the staff. The effective load of the workbench should be greater than 200kg.GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Electrical installation:GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Power configuration: 220V. According to the user's electric control cabinet configuration power should be greater than 6Kw.GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Installation of thermocouple: Insert into the furnace with a depth of 25mm, and use the N graduation number compensation wire to connect with the temperature control instrument. Note: The quartz tube should be installed first and then the thermocouple. The thermocouple should not be in contact with the quartz tube.GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
The electric furnace and the control cabinet are grounded as a whole, and the grounding resistance of the grounding wire should be less than 4Ω.GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Resistance wire connection mode: two wires in parallel, power supply: single-phase 220V. At the same time, due to transportation and other reasons, the fastening of each screw of the furnace body should be checked to confirm that it is correct.GmeMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac